Build Session 3, 10082010, 3 hours, 7 hours total
Empennage, Vertical Stabilizer Page 06-03
Completed Work on Steps 1 - 4 Both Left and Right, Match drilling Upper and Lower Spar Caps to the Rear Spar.
Match drilling the #40 and 3/16 holes for the K1000-3 Nutplates
No comments:
Post a Comment