Van's Aircraft RV-12

Van's Aircraft RV-12

Wednesday, October 13, 2010

10082010 Empennage (Build Session 3)

Build Session 3, 10082010, 3 hours, 7 hours total

Empennage, Vertical Stabilizer Page 06-03

Completed Work on Steps 1 - 4 Both Left and Right, Match drilling Upper and Lower Spar Caps to the Rear Spar.





Match drilling the #40 and 3/16 holes for the K1000-3 Nutplates

That is a lot of #30 Holes...


No comments:

Post a Comment