Build session 1 10032010, 2 hours 2 hours total
Empennage, Vertical Stabilizer Page 06-02
Manufactured my first parts today:
Upper and Lower Rudder Brackets with bearings
Others have talked about issues when the three aluminum pieces are sandwiched together with the bearings that the bearings did not move freely, mine move easily in all planes.
No comments:
Post a Comment