Van's Aircraft RV-12

Van's Aircraft RV-12

Saturday, October 16, 2010

10142010 Empennage (Build Session 6)

Build Session 6, 10142010, 2.5 hours, 15.5 total

Empennage, Vertical Stabilizer Page 06-05

Completed through Page 06-05 Steps 3 & 4

Rivet Count 27 Solid 11 Pulled

Primed the Vertical Stabilizer Spar and rib mating surface as well as the skin mating surfaces of the ribs.




Building the Vertical Stabilizer Skeleton






No comments:

Post a Comment