Build Session 6, 10142010, 2.5 hours, 15.5 total
Empennage, Vertical Stabilizer Page 06-05
Completed through Page 06-05 Steps 3 & 4
Rivet Count 27 Solid 11 Pulled
Primed the Vertical Stabilizer Spar and rib mating surface as well as the skin mating surfaces of the ribs.
Building the Vertical Stabilizer Skeleton
No comments:
Post a Comment