Van's Aircraft RV-12

Van's Aircraft RV-12

Thursday, October 14, 2010

10102010 Empennage (Build Session 4)

Build Session 4, 10102010, 3.5 hours, 10.5 total

Empennage, Vertical Stabilizer Page 06-03 and 06-04

Completed through Page 06-04 Steps 1-5

Rivet Count 10 Solid 8 Pulled

Here are the Spar Parts finished and laid out for priming. I am priming metal to Metal and the exposed back of the spar for the Verical Stab


Primed using Duplicolor 160 Self etching Primer (Napa)



Pulled rivets on the Upper spar caps notice I had to use the hand puller and the wedge tool to get those rivets close in on the spar flange.




No comments:

Post a Comment