Sunday, December 12, 2010

I am now a Pilot

Passed my Sport Pilot Checkride yesterday at KSDL was very thorough at almost 6 hours but I got through and have my ticket to fly. Lots more learning to do but now I can ask the question... who wants to go for a ride?

Thursday, November 18, 2010

Back to building this weekend

Back to building this weekend. Had to take some time getting ahead on work and getting ready for my wife to have surgery this week. Surgery went well she will have some time to recover but doing good.

Planes still down up at KSDL, hopefully back in the air on 11-22.

Friday, October 29, 2010

Flying down time

Getting the itch to fly, the two planes I fly out of KSDL were both badly damaged by the hailstorms in Scottsdale. This is bad news as I was down to my final practice before my check ride so I will have to spend a couple extra hours getting the rust off. Been almost a month since I was up on my own and yet another instructor to break in... :(

Break in the build :(

Haven't been on the kit in a couple weeks, lots of work during the week so normally building on the weekends. Camped out at the Copperstate Airshow Thursday and through the weekend last week so no building. Hopefully back at it tomorrow starting on the rudder.

Sunday, October 17, 2010

10172010 Empennage (Build Session 10)

Build Session 10, 10172010, 1.5 hours, 24 total

Empennage, Rudder Page 07-02 and 07-03

Completed through Step 07-03 and stopped to Prime contact parts.

Rivet Count 63 Solid 347 Pulled

Trial fitting rudder spar caps and hinge brackets


Trial fitting the rudder control horn



Fitting the rudder spar to the vertical stabilizer to check hardware and clearance, send ing question to Vans re the gap seen below, the plans allow for only one washer between the brackets. I don't think their should be a gap otherwise it will pinch when tightened, may be by design but it does not look right to me. (Note the spar holes and the brackets were pre-drilled and are self aligning)

Priming for assembly



10162010 Empennage (Build Session 9)

Build Session 9, 10162010, 1.5 hours, 22.5 total

Empennage, Rudder Page 07-02

Starting Section 7 Rudder
Completed Page 07-02 Steps 1 - 8

Rivet Count 63 Solid 347 Pulled


Match drilling the Ruder Spar caps for the upper hinge bracket assemblies where the rudder attaches to the vertical stabilizer


Saturday, October 16, 2010

10152010 Empennage (Build Session 8)

Build Session 8, 10152010, 4 hours, 21 total

Empennage, Vertical Stabilizer Page 06-06 and 06-07

Vertical Stabilizer complete!

Rivet Count 63 Solid 347 Pulled

Dimpling the Nutplates used on the VS Skin to attach the VS Fwd. Skin
The hand squeezer is mounted in the vice to give more leverage.

VS Fwd Skin Dimpled and nutplates attached partiallly


VS Skin is clecoed in place and ready for riveting

One side down...


Second side in process


Cool Shot


Rudder Brackets installed


and.... We have a recognizable airplane part, only 12, 153 rivets left to go.